The path starts from the product center: first look at the five cards, then click into the isomorphic teleoperation kit. Do not place an order using the abbreviation from a chat log. The parameters can be viewed before leaving your contact information; this article does not put specifications behind a form.
Evaluation Path
The second step is a written three-column table: standard, recommended, and optional, plus an exclusion clause. The contract must specify column names. Purchasing the robotic platform does not automatically include the kit. For remote operations, refer to the first two columns; for local data capture, refer to the third column — but orders must still be placed per cell. Do not write "one teleoperation kit, approximately 5 kg, with force feedback." Do not merge 30 RPM and 110 RPM into a single speed, and do not merge DC24V and DC12V into a single voltage. The third step is to contact us. Phone: +86 137 5502 0164, email: lk@langhuiai.com. Address: Beijing Langhui Technology Co., Ltd., 5th Floor, Room 501, Building F, Lugu Enterprise Plaza, No. 27 Wenxuan Road, Yuelu District, Changsha.
The page that should be opened after reading this article is /product-teleop-kit.html. Open the corresponding card only when the end effector or master unit is needed; do not record the two pages as one.
The evaluation response should be understood, at the pace published on the site, as a written configuration, not a verbal "we can do everything." Price and lead time are not covered in this article; they follow the written configuration.

How to Use This Page in This Version
The reader's next step is not to bookmark this article, but to open the product page and verify the original wording. The path is: Product Center https://www.tobi.cn/products.html, then go to the isomorphic teleoperation kit: /product-teleop-kit.html. Do not merge the five cards into a single note in the browser. Merging them into a single note is where mixed writing begins.
Do only three things on the product page. First, find the rows cited in this article and check whether they still match. Second, divide standard, recommended, and optional into three columns. The contract must specify the column names. Purchasing the unit does not by default include the kit. For remote operation, refer to the first two columns; for local data collection, refer to the third column; in both cases, order by the cell. Third, put sentences that cannot be written into the exclusion column. Do not write "one teleoperation kit, approximately 5 kg, with force feedback." Do not combine 30 RPM and 110 RPM into a single speed, and do not combine DC24V and DC12V into a single voltage. Only after completing these three things should you fill in the evaluation requirements.
Contact information is used to confirm the written configuration, not to qualify access to specifications. Phone +86 137 5502 0164, email lk@langhuiai.com, address 5th Floor, Room 501, Building F1, Lugu Enterprise Plaza, No. 27 Wenxuan Road, Yuelu District, Changsha, Beijing Langhui Technology Co., Ltd. The specification table is readable before you submit anything.
In the evaluation request, state the task height, object mass, whether the platform moves, whether master-side column names are needed, and whether an end-effector model is needed. Do not write "build an embodied AI system." The closer the writing is to a table, the closer the reply will be to an orderable configuration, rather than a paragraph re-explaining the specs.
Line-by-Line Verification
Degrees of freedom. All three columns have 7 degrees of freedom, but this does not mean they can be merged into one machine. The column names are GLN-RX75, GLN-RX71, and local isomorphic kit. This row only states the number of joints and body parts that have been publicly disclosed. It does not evaluate intelligence, and it does not automatically include waist, legs, neck, or a whole-machine total that is not named on the page. When writing the action vector, create channels only for body parts listed in this row; body parts not listed remain blank. Do not write blanks as 0, because 0 would be treated by training scripts as a real angle. Do not fill in the degrees-of-freedom integers from another device to complete this row. If the master-slave joint order is not given on the page, mark it as pending written configuration confirmation rather than numbering it yourself. Find the original degrees-of-freedom sentence on the product page before deciding whether to inquire. The action vector creates channels only for the body parts named in this row; unnamed body parts remain blank and are not filled with 0.
Load and mass. Main arm self-weight: GLN-RX75 is 7.8 kg, GLN-RX71 is 3.8 kg, and the local isomorphic kit is approximately 1.5 kg (including fixtures). Self-weight is not the rated payload at the end effector. The numbers in this row must be read aloud with their subject: rated, self-weight, full-machine mass, envelope, friction, or gripping force. If the subject differs, they cannot be merged into a single number, nor can any conversion not given on the page be performed. If objects in the field are heavier, the specifications cannot be changed retroactively; conversely, larger specifications do not prove that every grasping method reaches that limit. The tool mass is undetermined; do not write the arm's rated value as the mass of objects it can grasp. The acceptance checklist retains the original units. Confirm the load subject on the product page before describing objects. During acceptance, read the subject first and then the number; if the subject is inconsistent, split into two rows.
Outline and scale. Working radius: 709 mm, 474 mm, 599 mm. This is the scale of the primary arm, not the outline of the slave unit. This row describes the outline or structural scale, used to check doors, elevators, tabletops, or transport; it is not the operating height, nor is it the arm span. Do not add it to the vertical range. If the diagram shows protrusions, antennas, or personnel standing positions not present in this row, note separately that they are not part of the specification. If weight appears in an adjacent row, do not include it in the dimension sentence. After comparing the site door width with this row, write the result into the requirements; do not write "space is sufficient" without providing numbers. Doors, elevators, and transport are checked only against the outline; do not treat this row as the operating height.
Operating range. Configuration: the first two columns are humanoid configurations, and the local column is the same as the slave arm. Grip: the first two columns use a handle, and the local column uses a rail-type ring fixture. This row describes the range that the hand or lift can reach; the definition must follow the original sentence: vertical working range, arm span, working radius, or stroke—these cannot be added to each other or renamed. If "excluding end effector" is stated, it must remain in the figure caption. If the original text does not specify units, preserve the note "units not specified"; do not delete it for the sake of tidiness. Write the operating height together with the definition of this row into the requirements. The figure caption should retain the range definition from the original sentence, as well as the words "excluding end effector" or "units not specified."
Motion. Maximum operating speed: 30 RPM in the first two columns, 110 RPM in the local column. All three columns list zero-force gravity compensation for the dragging force. Zero-force gravity compensation is not force feedback. This row describes how the ground unit or primary arm moves. Four-wheel steering, four-wheel drive, differential drive, in-place rotation radius, and rotational speed are terms for different mechanisms and cannot be substituted for one another. The published speed is a capability, not a recommended teaching speed; teaching may be slower, but the slower speed is recorded in the experimental conditions and is not written back as a specification. If the page does not state gradeability or positioning, do not borrow from another page. Specify whether chassis movement is required or which column's primary arm is used. The teaching speed may be lower, but the lower speed is recorded in the conditions and does not change the published capability in this row.
Power. Operating voltage: DC24V in the first two columns, DC12V in the local column. Power: ≤200 W, ≤100 W, rated 84 W. The specification table has no battery row, so do not state battery life. This row retains only the electrical terms that appear on the page: voltage, capacity, battery life, charging, current, or power. If there is no "hours," state that battery life is not given; do not fill in hours from an adjacent page. Do not rename charging time as battery life. Rated and maximum values must be listed in separate columns. Preserve "approximately" for approximate values. Do not sum the ampere-hours of multiple devices and present the total as the battery of a single device. Do not request a battery life commitment in the requirements that is not present on the page. Hours, charging, or current that do not appear remain as not given; do not copy them in from an adjacent page.
Perception and computing. Angular resolution: first two columns ±0.003°, local column 0.088°. Motors: first two columns integrated joints, local column bus servos. Communication: first two columns RJ45, local column RJ45 / 10-pin aviation connector. This row inventories items already specified under sensors, computing, or communication, and retains the terms standard, included, optional, and optional-order. An optional item not checked does not count. If the cover conflicts with the checklist, cite the checklist, while not pretending the cover statement does not exist. Headsets and gloves do not enter this row. Do not draw processors, storage capacity, or camera channel counts into the system diagram if they are not specified. State whether the standard checklist or a specific optional item is required. Optional sensors not purchased do not enter this data dictionary.
End effector. The fixture in the local column is a rail-type ring fixture used to hold the primary arm; it is not the slave unit's RMG22-65. The slave gripper is ordered separately. This row states at which end contact or gripping occurs. Quick-change, compatible, and recommended are not models included in the box. The ring fixture on the primary arm is not the slave gripper. Force, stroke, and payload remain as they are in their respective rows and are not merged into a single system metric because they are installed on a particular unit. Flanges and protocol mappings that are not given should be marked as to be confirmed, not as plug-and-play. Specify the end effector model or explicitly state that no end effector is needed. "Supports" or "compatible" without a model number cannot be treated as delivered.
Boundaries. Force feedback is listed as supported only for GLN-RX75 and GLN-RX71. The local isomorphic kit is listed as not supported. The primary arm models are RX75, RX71, and YDS-DAP-75/65/RX75S respectively. This row is a boundary deliberately separated on the page: a different model, a different column, a different product page, or an interface that still requires project confirmation after modularization. The boundary is not a defect description; it prevents verbally purchasing two pages as one. When writing a proposal, copy the boundary into "not included in this engagement." If equipment that is not included is added later, open a new configuration sheet; do not go back and change the unit name in the old sample. If another card is also needed, write it as a second line in the requirements. Equipment within the boundary must be ordered separately; do not rename the old sample to say it already includes it.
Configuration column. The contract must specify column names. Purchasing the robotic platform does not include the kit by default. For remote operation, refer to the first two columns; for local data capture, refer to the third column; in either case, order by cell. This row distinguishes standard, recommended, and optional. Recommended and optional items that are not checked will not be delivered. If the standard row and the parameter table row are inconsistent, keep both rows and use "locked for this order" to indicate which one is actually delivered, rather than striking out one row in the order without signing off. Prices and lead times are not written into the paraphrase of this row. Requirements are filled in across three columns: standard, recommended, and optional. Unchecked recommended and optional items are written on the order as not delivered.
Excerptable. Copy the attachments column by column; do not merge them. Example: GLN-RX75, force feedback supported, 709 mm, 7.8 kg, handle, ±0.003°, 30 RPM, integrated joint, RJ45, DC24V, ≤200 W. This row is the type that can be pasted into an attachment: it has a subject, includes units, and can be traced back to the original sentence on the product page. When pasting, preserve "approximately," "not included," "not given," "optional," and "recommended." Do not convert and keep only the result. If the same number has different meanings on two pages, write it as two rows in the attachment. Do not mix test protocols into specification excerpts. First verify the original sentence that can be copied, then submit the evaluation. When pasting into an attachment, paste the words "approximately," "not included," and "optional" along with the content.
Do not write. Do not write "one teleoperation kit, approximately 5 kg, with force feedback." Do not combine 30 RPM and 110 RPM into a single speed, and do not combine DC24V and DC12V into a single voltage. This row is a negative statement for review purposes. It does not describe what the equipment can do; it only prevents hours from an adjacent page, degrees of freedom, payload subjects, or cover slogans from being written in. If a negative statement is triggered, revert to the original sentence on the product page; do not interpret it as "close enough." Do not write in success rates from external papers or total hours not publicly disclosed on this site. The requirements text must not contain the statements prohibited by the negative statements. If a draft search triggers a negative statement, revert to the original sentence on the product page.
| Projects | Public-Facing Positioning of This Page |
|---|---|
| Degrees of Freedom | All three columns have 7 degrees of freedom, but this does not mean they can be merged into a single unit. The column names are GLN-RX75, GLN-RX71, and local isomorphic kit. |
| Load and Mass | Main arm self-weight: GLN-RX75 is 7.8 kg, GLN-RX71 is 3.8 kg, the local isomorphic kit is approximately 1.5 kg (including the fixture). Self-weight is not the rated payload at the end-effector. |
| Form Factor and Scale | Working radius: 709 mm, 474 mm, 599 mm. These are the dimensions of the main arm, not the outline of the end unit. |
| Operating Range | Configuration: the first two columns are anthropomorphic configurations; the local column is the same as the follower arm. Gripping: the first two columns use handles; the local column uses a rail-mounted finger-ring fixture. |
| Motion | Maximum operating speed: the first two columns are 30 RPM, the local column is 110 RPM. All three columns list zero-force gravity compensation. Zero-force gravity compensation is not force feedback. |
| Power | Operating voltage: the first two columns are DC24V, the local column is DC12V. Power: ≤200 W, ≤100 W, rated 84 W. The specification table has no battery row, so do not state battery life. |
| Perception & Compute | Angular resolution: the first two columns are ±0.003°, the local column is 0.088°. Motor: the first two columns use integrated joints, the local column uses bus servos. Communication: the first two columns use RJ45, the local column uses RJ45 / 10-pin aviation connector. |
| End Effector | The fixture in the local column is a rail-type ring fixture used to hold the main arm; it is not the RMG22-65 end-effector. The end-effector gripper is ordered separately. |
| Boundary | Force feedback is listed as supported only for GLN-RX75 and GLN-RX71. The local isomorphic kit is listed as not supported. The main arm models are RX75, RX71, and YDS-DAP-75/65/RX75S. |
| Configuration Panel | The contract must specify column names. Purchasing the platform does not include the kit by default. For remote operation, refer to the first two columns; for local data capture, refer to the third column; in either case, order by the individual cell. |
| Excerptable | Transcribe the attachments column by column; do not merge. Example: GLN-RX75, force feedback supported, 709 mm, 7.8 kg, handle, ±0.003°, 30 RPM, integrated joint, RJ45, DC24V, ≤200 W. |
| Do not write | Do not write "one teleoperation kit, approximately 5 kg, with force feedback." Do not write 30 RPM and 110 RPM as a single speed, and do not write DC24V and DC12V as a single voltage. |

Relationship to Public Methods and Adjacent Pages
The evaluation path starts from the product center, not from a verbal model name in a chat log. The entry point is https://www.tobi.cn/products.html . Five cards are separate: folding dual-arm, lifting dual-arm, wheeled humanoid, isomorphic teleoperation kit, two-finger gripper. Click into the corresponding product page and read only the specification table and configuration column on that page. When a comparison is needed, open the second card; do not merge the two pages into one in memory.
The second step of the path is the written configuration: standard row, recommended row, optional row, plus sentences explicitly stating what is not included. The third step is contact. The phone number is +86 137 5502 0164, the email is lk@langhuiai.com, and the address is 5th Floor, Building F1, Lugu Enterprise Plaza, No. 27 Wenxuan Road, Yuelu District, Changsha City, Beijing Langhui Technology Co., Ltd. Specifications and examples should be viewable before leaving contact information. This article does not create a barrier of "you must leave your details to see the parameters".
Do not insert external brand site links into the path, and do not write the data market as having accumulated a certain number of hours. The site's homepage currently publishes browsing by scenario, sample verification, fields, quality notes, and licensing—not a total hour count.
This article places that product back at which step of this path, and writes out the one product page the reader should open after finishing.
Before handing off to a colleague
After reading, do not stop at the article. Open the product center, go to the corresponding product page, and re-check the rows cited in this article. If there is a discrepancy, the product page takes precedence; the article is considered a paraphrase that needs correction. Then fill in the three-column requirement: task height and load, whether the main-end column is needed, and the end-effector model or explicitly "none." The contact phone number and email are used only to confirm this written requirement. Do not request hours not present on the page in the requirement, and do not write the five cards as a single system. Before submitting the requirement, do a final check against the product page: height definition copied, load subject copied, mobility mechanism copied, main-end column name selected or explicitly "none," end-effector model written or explicitly "none," and no hours requested that do not exist on the page. If any of the six items is missing, do not submit. Submission channels are the assessment form on the page or the public phone number and email. Do not paste the parameters of the five cards into a single paragraph of one email.
First, all six items must be checked before submission.
Second, do not submit if anything is missing.
Third, the five cards are not written into the same paragraph.
Fourth, do not request hours that do not exist.
Fifth, the product page takes precedence over this article.
Sixth, contact information only confirms written requirements.
Continue Reading
- 01 Task Boundaries
- 02 Specification Standards
- 03 Degrees of Freedom
- 04 Payload & Self-Weight
- 05 Workspace
- 06 Locomotion Method
- 07 Perception and Computing
- 08 Power Specifications
- 09 Data Recording
- 10 Time Alignment
- 11 End-Effector Boundaries
- 12 Site Constraints
- 13 Configuration Sheet
- 14 Three-Way Comparison
- 15 Literature References
- 16 Master-Slave Workstation
- 17 Acceptable Deliverable Statements
- 18 Prohibited Conflations
- 19 On-Site Deployment
- 20 Evaluation Path
Back to Product Center View this product page
This article was written on October 3, 2026, for selection and specification verification purposes. Device parameters are subject to the product page tables and do not constitute a supply commitment. External papers only illustrate how problems are framed in the industry; their success rates and data scales belong to the original authors' experiments and are not TOBI's measured results. Phone: +86 137 5502 0164.