Multi-view manipulation
Specify views, occlusion and workspace before selecting cameras and output modes.
TOBI E8 / MULTIMODAL CAPTURE
Bring vision and motion into one capture design.
For research projects combining multiple views, depth and motion. Define cameras, outputs and timing before validating the setup against a real task.
Supply and configuration require confirmation · development targets are not measured results

DESIGN THE CAPTURE WORKFLOW
Specify views, occlusion and workspace before selecting cameras and output modes.
Define joints, coordinate frames, calibration and validity. Human joints are not directly usable robot actions.
Confirm rates, timestamps and errors for each stream. Test synchronization, tracking and training outcomes independently.
CONFIGURATION / EVIDENCE
This summary uses existing product materials and explicitly identifies discrepancies. Use the latest mutually confirmed specification for procurement.
| Vision configuration | The product matrix lists 10 cameras plus TOF; the former detail page said eight. Resolve this discrepancy against the latest specification before procurement. |
|---|---|
| Tracking figure | 1.5mm is a development target in the product matrix, not a verified accuracy result. |
| Data modalities | Planning materials list video, TOF, SLAM, IMU, timestamps, calibration and audio; confirm fields against the firmware version. |
| Motion-capture expansion | Evaluate additional motion-capture modules; confirm node count, installation, calibration, joint output and validity. |
| Wearability & power | The matrix lists 280g total and a rear 5500mAh battery; confirm the final configuration, accessory weight and runtime in writing. |
| Current supply | September 2026 was a historical production plan, not confirmation of production or stock. Confirm evaluation availability, lead time and support per project. |
DATA & PROJECT READINESS
Device observations do not automatically equal robot action labels. First confirm the data fields, timestamps, coordinate frames, target action space and data quality, then validate the conversion and training pipeline.Device observations are not automatically robot-action labels. Validate fields, timestamps, coordinate frames, target action space and quality before conversion and training.
Provide the task, quantity and planned delivery date. Confirm the device version, firmware, accessories, support scope and acceptance method in writing. Historical prototypes or production plans do not mean current stock is available.Provide the task, quantity and delivery window. Confirm the version, firmware, accessories, support and acceptance method in writing. Historical production plans do not confirm current stock.
Starting together does not mean clock synchronization. For a combined solution, confirm the clock source, interfaces, timestamp definitions, error statistics and dropped-frame handling; single-device metrics cannot substitute for full-system acceptance.Starting together is not clock synchronization. Confirm clock source, interfaces, timestamp definitions, error statistics and dropped-frame handling for the complete system.