On TOBI's Embodied Data page, logistics and warehousing is not a slogan — it is a set of selectable sub-tasks. The publicly listed tasks related to it include: sorting, pre-delivery packing, and bin picking and placement. Marketing tends to describe the scenario as "an industry package," but what is actually usable on the algorithmic side is breaking these tasks down into Episodes with defined start and end states.

Why slice by task rather than by industry
Within the same industry, hand trajectories for laminating, assembly, sorting, or tidying do not share the same set of failure causes. If only a single "logistics warehousing" label is applied, buyers cannot determine which segment of skill they are missing. The first step in scene understanding is to list objects, hands, containers, and completion criteria — not to report total hours first.
Capture capabilities TOBI can provide for this scenario
Define the capability boundary clearly: the head-mounted Ego captures what the operator sees, while the wrist module captures the end-effector. Whether to enable it, and whether to use E2, E6, or E8, depends on workstation distance and occlusion — not on how good the model name sounds. The solution page presents E2 together with warehouse mobility and industrial protection in the same narrative; a wrist module can be added for sorting end-effector tasks. Specific combinations must be verified against the current version of the specification sheet and an on-site survey; this article does not replace selection confirmation.
What a trainable segment looks like
Recommended to retain at least: task name, start and end states, primary objects, whether both hands are used, ambient lighting, device serial number, and specification version. If failed attempts have been authorized, they should be stored separately from successful ones. This way, logistics and warehousing data can be retrieved and searched, rather than becoming an unverifiable long recording.
Compliance notice: This document provides scenario methodology and a comparison with public literature. It does not constitute a commitment regarding capture success rates, model performance, or delivery schedules. Equipment configurations, tradeable hours, pricing, and licensing scope are subject to the written order. The papers cited herein are third-party public works and do not constitute a claim of TOBI Technology achievements. Illustrations are sourced from TOBI Technology's public equipment materials.