Back to News & Insights

Research Frontier · Tiered Data · 2026-09-21

How to Choose a Tier for D2/D3/D4 Delivery: Files, Structured Results, Indexes and Validity

How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity. Four delivery sample cards and a method for choosing depth; format labels are for integration. Entry point: https://www.tobi.cn/solutions-data.html#grades

TOBI Newsroom · Tiered Data Series · 2026-09-21 · Source page solutions-data.html#grades

The delivery samples present TOBI DATA PACK as a D2→D3→D4 depth selection, broken into four cards: data files, structured results, data index, and quality report. Format labels such as MP4 / CSV / JSON / JSONL / HTML are for integration, not marketing stickers.

Public imagery related to delivery
Public imagery related to delivery.

How to choose depth

Choose depth based on the project. Default is D2; for VLM use cases, D3 is recommended; for hand-assisted tasks, add D4. The page button "View real delivery samples" should open a verifiable link.

The D2 / D3 / D4 description strips and the four-card content should be consistent, to avoid sales verbally adding items not included in the attachment.

What each of the four cards contains

Data files: video / multi-channel raw footage, IMU, time synchronization, and audio offsets. Structured results: narration, keyframes, object time ranges, hand trajectories, action time ranges.

Data index: Episode / task timestamps, scene and file associations, RGB / hand / synchronization index. Quality report: data volume and validity rate, anomalies and gating, QA / validity.

Purpose bar.Training / evaluation / research can be checked, but checking does not change field honesty.

How to describe the reserved directory

If MCAP and LeRobot directories have been reserved but not yet exported, this must be stated explicitly. The buyer may plan around future interfaces, but cannot accept delivery on the basis of items marked as "already delivered."

Acceptance and Communication Checklist

  • Verify that the four card links open correctly.
  • Verify that the format matches the buyer's pipeline.
  • Verify that episode_bundle is included.
  • Verify whether MCAP / LeRobot is only reserved but not exported.
  • Verify that the D2 / D3 / D4 descriptions match the order.
  • Verify whether the use-case checkbox is recorded in the remarks.
  • Verify whether the hash and size are included in the report.
  • Check whether sample page comparisons are provided.
  • Verify that Chinese and English field names are documented.
  • Verify that the after-sales Q&A channel is specified.

How the Newsroom Writes This Topic

External communications and internal training should reference the same page:Tiered Data and Delivery Sample. If roadshow pages, posters, channel articles, or promotional content conflict with the sample fields, errata should be made based on the openable fields of the official website samples, not overridden with louder slogans.

Delivery Samples as Acceptance Scripts

The four cards are not decoration. Buyer acceptance can be checked card by card: whether the files are complete, whether the structured results are parseable, whether the index is seekable, and whether the report can be used to reject delivery. Format labels tell the engineering team which parser to use; real links tell the audit team whether they can be opened. Reserved directories must be marked as "not exported," otherwise the directory name becomes a false delivery claim.

Common Communication Pitfalls

In communications related to "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity," common pitfalls include: treating the four cards as decoration; treating reserved directories as already exported; verbal commitments not reflected in attachments. The correction is simple: return to the tiering page and delivery samples, open the links, and write the field names into the requirements document and acceptance form. If news or sales copy cannot point to an openable sample, it should be paused until the samples and attachments are aligned.

The cost of misconceptions is not just rework. Wrong supervision enters model weights, wrong authorization enters compliance risk, wrong catalog entries enter engineering debt. Official news writes out misconceptions to reduce industry collaboration costs, not to blame any particular type of buyer.

Suggested field comparison with the official website page

It is recommended to open the three-level pages side by side in a browser: tiered diagram cards and pipeline, four delivery sample cards, and related articles in this series. Use pen and paper or a table to list: depth, directory, key file names, whether optional, and acceptance method. Only after the table is complete should you decide on in-stock hours and equipment selection. Reversing the order makes it easy to purchase the wrong package.

If your team uses an internal wiki, paste the official website link rather than paraphrasing screenshots. Screenshots go out of date; the samples and specifications pointed to by the link will be updated. When updates occur, the version number and announcement take precedence, and the acceptance version should be locked in the order.

During cross-departmental review, the algorithm lead confirms the training read path, the data lead confirms indexing and validity, legal confirms authorization and redaction, and procurement confirms depth and hours. Four people checking against the same field table is closer to a deliverable state than four people each writing a paragraph of adjectives.

Field table example and acceptance dialogue

A dialogue that can be read aloud at a review meeting is as follows. Procurement asks: What is the depth of this order? Answer: Write D2, or D2+D3, or including optional D4, and keep it consistent with the quote. Algorithm asks: Where do we read for training? Answer: The native sources under device/ and the time synchronization under indexes/; previews do not enter the training columns. Data asks: What about missing columns? Answer: Leave them blank; do not fill in fake values. Legal asks: Authorization and redaction? Answer: The contract attachment states the scope; estimates state the method. QA asks: How do we reject? Answer: According to the validity gate and the list of failure segments. Writing this dialogue as meeting minutes is closer to delivery than writing it as a paragraph of adjectives.

Field example (copyable into a requirements sheet): depth; device model and serial number strategy; scenario and secondary task; number of hours; whether narrative is included; whether estimates and method are included; whether audio offset is required; validity gate version; authorization number; whether failed attempts are separated; delivery window; acceptance contact. Every cell should point to a row in a sample page or attachment. If any cell can only be filled with "TBD," the order has not yet reached a scale-ready state.

Boundaries with Adjacent Topics

This article focuses on "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" and does not replace the details in adjacent articles. If you still have field-level questions after reading, jump to the corresponding depth or pipeline article in the series rather than adding verbal explanations here. The series navigation links provide the previous and next articles for continuous reading; the in-stock and equipment entry points serve readers ready to act immediately.

Boundary awareness protects the reader's time: the main roadmap article covers the map, the D1 article covers the raw footage, and the D2 article covers alignment; the same ultra-long general essay should not be copy-pasted into every article. However, each article must still carry its own complete compliance section and checklist, so that a single article can be independently forwarded to a customer email without being incomplete.

Publication and correction mechanism

This article is updated in step with the version of the tiering page on the official website. If sample links, format labels, or gating descriptions change, the newsroom should publish a correction or replacement article under a new version number, while keeping an understandable title continuity in the news list. The acceptance version locked in a customer contract does not change automatically because of a news update; any change must go through written confirmation.

Errata feedback based on the field table is welcome: please specify the page anchor, sample file name, and expected field. Modification requests based solely on subjective impressions asking to "make it stronger" are not welcome — if "stronger" cannot be opened, it cannot enter official news.

Beijing Langhui Technology Co., Ltd. accepts embodied AI collaboration inquiries through the address and hotline disclosed on its official website. For technical roadmap discussions, please include the target paradigm, depth, and scenario tasks; material requests and quotations are subject to written confirmation. This article may be forwarded; when forwarding, please retain the compliance section and source link to avoid it being excerpted into absolute promotional claims.

Readability and layout notes

This draft uses the official newsroom layout: lead block, entry buttons, tiered subheadings, checklist card, compliance notice box, and series navigation. The checklist uses short sentences to avoid copy-pasting the same set of phrasing; images include captions to avoid large unexplained images interrupting the reading flow. On mobile, the single-column body width is maintained for easy forwarding by frontline procurement and algorithm colleagues.

A Ten-Minute Path for First-Time Readers

Minutes 1–2: Open the tiering page and identify the four card types D1 through D4 and the pipeline arrows. Minutes 3–4: Open the delivery samples and click at least one real link among the four cards to confirm that it opens. Minutes 5–6: Return to this article's checklist and tick the applicable items into the requirements draft. Minutes 7–8: Decide whether you need spot hours or equipment, and open the corresponding entry point. Minutes 9–10: Forward the compliance section together with the source links to colleagues to avoid distortion from partial excerpts.

If after ten minutes you still cannot articulate the depth and scenario tasks, it means the project initiation information is insufficient; you should first complete the target paradigm and authorization scope rather than continuing to purchase undefined hours. The purpose of official news is to turn those ten minutes into a repeatable organizational action, not a one-time reading experience.

Around "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity," remember three takeaways: fields must be openable, responsibilities must be layered, and commitments must be acceptable. Achieve these three, and the technical roadmap returns from poster language to collaborative engineering and contract language. Without them, no matter how long the article is, it is merely decoration.

Method notes: how to use it in real operations

Place "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" back into operational context rather than leaving it at abstract nouns. Take "back-kitchen food preparation" as an example: first confirm whether the goal is VLM description and question answering, or whether real-robot post-training is required; then decide whether to stop at D2 or whether D3 narration must be added; if auxiliary points for hand entry into containers are needed, then evaluate whether to purchase D4. The same logic applies to "warehouse picking and unpacking" and "supermarket shelf restocking": the task names differ, but the field discipline is the same.

The method steps are recommended to be written as: define the paradigm → define the depth → open sample links to verify fields → write the requirements form → select spot hours or equipment → lock the acceptance version. If any step uses adjectives in place of field names, it should be sent back to the previous step. A team can run through these five steps in a single internal rehearsal; the rehearsal record is more useful than another meeting arguing about whether the data is good.

If a drill reveals that a sample cannot be opened, offsets are undeclared, the narrative is not from the wearer's perspective, estimates lack a method, or previews have leaked into the training path, this indicates that the topic has not yet reached a scale-ready state. The correct action is to fix the fields and attachments, not to increase marketing efforts. Official news spells out the method clearly so that customers and partners can collaborate using the same checklist.

For teams that already have a field table, this article's checklist can be mapped to an internal ticketing system: each item corresponds to an owner and a deadline. Until the mapping is complete, it is not recommended to present this topic as an external milestone poster. A collaborative technical roadmap always looks more like a checklist than a slogan.

One final organizational suggestion: write the link to this article and the tiering page anchor into the same chapter of both the new-employee handbook and the sales handbook, so that the two teams do not each hold their own verbal version. The day the fields are aligned is the day the marketing gains momentum.

The above methodology can be printed together with this article's checklist as the cover page of a project initiation review attachment. Simply note the official tiered page link and date in the upper right corner of the printout. This page can be archived together with the requirements document.

How a buyer review meeting is run

Around "How to choose tiers when delivering per D2 D3 D4: files, structured results, index and validity," it is recommended to split the review meeting into three segments: the first segment only reads public samples and field tables, prohibiting discussion of unpublished scores; the second segment assigns responsibilities item by item against the checklist in this article; the third segment decides the depth tier and whether to purchase bypass capabilities. The meeting output should be a signable field alignment table, not a slogan-style memo.

Within 48 hours after the review meeting concludes, the meeting conclusions should be written back to the requirements document attachment and the internal work order status updated. If the conclusions conflict with the official samples, the openable samples take precedence, and both parties' data leads should be copied via email. Before the conflict is resolved, it is not recommended to proceed with expanded collection or equipment orders.

For projects requiring multi-department joint sign-off, this article can be used as a "common language" attachment: R&D reviews the fields, procurement reviews the media and acceptance milestones, and legal reviews the authorization and de-identification boundaries. Having all three parties sign in the blank spaces of the attachment results in less rework than three unrelated memoranda.

How to conduct spot checks after delivery

Post-delivery spot checks should cover three categories: whether files can be opened via the sample paths; whether key fields are non-empty and units are consistent; and whether narratives and estimates (if purchased) conform to the wearer's perspective and the declared method. The spot-check ratio and the non-conformance handling path must be written in advance in the order attachments to avoid ad-hoc negotiation after delivery.

A recommended fixed spot-check report template: sampling list, non-conforming items, handling conclusion, re-inspection date. The report can be archived together with links to this news series, forming a dual-track record of "public statement + order execution." The public statement is for external explanation; the order execution is for internal accountability. The two should not be merged into a single advertorial.

Procurement Alignment and Archiving Recommendations

When reading this article on "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" alongside the "Solutions · Tiered Data" page, it is recommended to map the section headings to an internal review agenda: write native frame rate, index spot-check, manual annotation spot-check, and delivery sample links as four checkable items, and reference this article's publication date and page path in the order attachment to avoid drift between verbal commitments and written terms.

If your company already has data collection specifications, treat the field recommendations in "How to choose delivery tiers under D2 D3 D4: files, structured results, index and validity" as an alignment table rather than a replacement table: first list your existing fields, then mark which ones can be mapped to the public samples on the tiering page and which are internal extensions. Completing the mapping before expanding collection can reduce rework.

For cross-department collaboration, it is recommended that the data owner host the alignment meeting: R&D confirms the training interface fields, procurement confirms the delivery medium and acceptance milestones, and legal confirms the authorization and de-identification boundaries. The meeting minutes can directly cite the "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" section to reduce errors from secondhand paraphrasing.

After the public page is updated, historical orders remain governed by the signed attachment. If new terms related to "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" need to be synchronized to orders in execution, a change order should be processed with confirmation from both parties, rather than defaulting to the latest webpage copy.

For overseas teams, it is recommended to maintain a Chinese-English field name reference and specify numeric units in the field descriptions. Around "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity," the Chinese and English columns on the tiering page should point to the same facts, avoiding divergent evolution of the two language versions.

Quality spot-checks should fix the sampling ratio and the nonconformance handling path: full-batch rework, partial re-labeling, or downgraded delivery must be specified in advance in the order attachment. "How to choose a delivery tier for D2, D3, and D4: files, structured results, index, and validity" provides the methodology; specific thresholds are locked by both parties in the order.

Attachments: contact info · WeChat QR code · requirements form

Beijing Langhui Technology Co., Ltd. (TOBI) welcomes technical discussions based on the field specification sheet. Public entry points:Tiered Data · Delivery Sample · Annotation Workbench · News list.

Langhui Embodied Data WeChat QR Code

Scan the QR code to add a consultant(Langhui Embodied Data · Changsha, Hunan)

Address: 5th Floor, Room 501, Building F1, Lugu Enterprise Plaza, No. 27 Wenxuan Road, Yuelu District, Changsha

Embodied AI partnerships:+86 137 5502 0164(Embodied AI Division)

After form submission, a consultant will follow up; quotations, lead times, and inventory are subject to written confirmation. 2026-09-21

Compliance notice: Equipment configurations, estimation methods, and licensing scope are subject to written confirmation and the current specification sheet. Illustrations are from TOBI Technology's public materials, and the captions have clarified that they are not customer sites.

Series Navigation: ← Previous · Tiered Data Page · News list · Next →

Back to News List